Improving EM Score Accuracy with Pending Task Logic

Strengthening EM Score Accuracy Through Historical Pending Task Inclusion

Strengthening EM Score Accuracy Through Historical Pending Task Inclusion

About the Client

The client uses a structured EM (Execution Monitoring) Score system to evaluate weekly task completion and team performance. The EM score is a key performance metric used to measure accountability, execution discipline, and operational efficiency across departments.

As the organization scaled, EM scoring became central to leadership reviews and performance discussions.

The Execution Visibility Gap

While the EM score was functioning, a critical limitation in its calculation logic created a performance visibility gap.

The system counted:

  • Tasks pending from the immediate previous week

However, it did not count:

  • Tasks that were pending from earlier weeks (older than one week)

This created practical challenges:

  • Long-standing pending tasks were excluded from the current EM calculations
  • The EM score did not reflect the total execution backlog
  • Teams were not consistently accountable for unresolved historical tasks
  • Performance metrics appeared stronger than the actual operational reality

In short, the EM score was not fully aligned with true execution performance.

What the Client Needed

The client requested a more accurate and disciplined scoring system that could answer one essential question:

“Does the EM score reflect every pending task, regardless of when it was created?”

Their requirements included:

  • Inclusion of all pending tasks from previous weeks
  • Continuous impact of unresolved tasks on weekly EM scores
  • Removal of loopholes in the execution measurement
  • Accurate reflection of backlog until task completion

They needed a system where accountability would persist until resolution.

Designing a Backlog-Inclusive EM Logic

To address this requirement, the EM score calculation logic was redesigned and enhanced.

The updated system now:

  1. Identifies all pending tasks, regardless of their original week.
  2. Includes every unresolved task in the current week’s EM score.
  3. Ensures pending tasks continue to influence weekly performance until marked complete.
  4. Maintains historical tracking accuracy without duplication errors.

This created a more disciplined and transparent execution framework.

How the Updated Logic Works

Under the revised system:

  • If a task remains incomplete, it continues to be counted week after week.
  • No pending task disappears from the scoring logic.
  • The EM score dynamically reflects real-time execution backlog.

For example:

If a task was created three weeks ago and remains incomplete, it will continue to impact:

  • Week 1 EM Score
  • Week 2 EM Score
  • Week 3 EM Score

Until it is completed.

Accountability remains active until resolution.

Impact on Operational Performance

After implementation, the client experienced measurable improvements:

  • Improved accuracy in weekly EM reporting
  • Stronger accountability across departments
  • Increased urgency in clearing long-pending tasks
  • Transparent performance measurement
  • Reduction in backlog accumulation
  • More realistic execution metrics

Teams became more focused on closure rather than temporary score optimization.

Turning Metrics into Execution Discipline

By enhancing the EM score logic to include all historical pending tasks, the client transformed their performance tracking system into a more reliable and disciplined accountability framework.

The updated system ensures:

  • No backlog is hidden
  • No unresolved task is ignored
  • Performance metrics reflect true operational reality

With this enhancement, the EM score now serves as a transparent, execution-driven performance indicator that strengthens organizational discipline and decision-making.